End-to-end delivery — from feasibility to handover. We act as the single point of accountability between investor, designer and contractor, protecting cost, time and quality at every gateway.

The single thread that holds a project together.

Construction projects fail at the seams — between disciplines, between phases, between what was agreed and what was delivered. Our role is to own those seams: to define them, to monitor them, and to escalate them before they become claims.

We bring 20 years of cross-border experience, a structured methodology aligned with FIDIC and RICS practice, and a small senior team that stays on the project from kickoff to handover. No churn, no escalation chains, no surprises.

Whether we act as Owner's Representative, embedded PM lead or programme advisor, the deliverables are the same: a baseline you can trust, a report you can read in five minutes, and a handover dossier the operations team will actually use.

What's included in a PM engagement.

01
Feasibility studies Site appraisal, zoning analysis, options brief, GFA & yield modelling.
02
Programme planning Master programme, gateway milestones, critical path analysis (Primavera / MS Project).
03
Stakeholder coordination Client–design–contractor interface, RFI & decision log, weekly steering.
04
Risk register & mitigation Quantified risk matrix, owner assignment, mitigation tracker, monthly review.
05
Tender & procurement strategy Package strategy, prequalification, FIDIC drafting, bid evaluation, recommendation.
06
Change & variation control Change request log, cost & time impact assessment, instruction issuance, audit trail.
07
Progress reporting Monthly client report — earned value, S-curve, photo log, KPI dashboard.
08
Commissioning & handover Snagging coordination, O&M dossier, defects liability period management.

A 5-stage methodology, repeatable across asset classes.

01
Week 1—3
Brief & Mobilisation

Kick-off workshop, RACI matrix, communication protocol, baseline programme draft.

02
Month 2—5
Pre-construction

Design coordination, value engineering, cost plan freeze, tender package release.

03
Month 4—6
Tender & Award

Bid evaluation, contractor recommendation, contract negotiation, mobilisation plan.

04
Month 6—24
Construction

Weekly site coordination, monthly client report, change & risk control, QA gates.

05
Month 24—27
Handover

Snagging, commissioning, O&M, training, defects liability handover, lessons learned.

What you actually receive — every month, every milestone.

DELIVERABLE / 01
Master programme (Primavera P6)

Baseline schedule with logic links, resource loading and a monthly update cycle.

DELIVERABLE / 02
Monthly progress report

Standardised dashboard — cost, time, risk, photos, lookahead. PDF + dashboard link.

DELIVERABLE / 03
Risk register (live)

Quantified register with owner, probability, impact and mitigation status.

DELIVERABLE / 04
Change order log

Auditable record of every variation — instruction, cost & time impact, sign-off chain.

DELIVERABLE / 05
Tender documentation

Full package — drawings, BoQ, FIDIC conditions, employer requirements, evaluation report.

DELIVERABLE / 06
Handover dossier

O&M manuals, as-builts, warranties, snagging clearance and training records.

0
PM projects delivered
1.2M m²
Total GFA supervised
0
Countries
0
Years of practice

Explore 85+ projects we've delivered as Project Manager.

Filter by sector, country, year and project size. Every entry includes brief, scope, role and key outcomes.

See all PM projects (85+) →
YandexMicrosoftBelgrade WaterfrontDelhaizeAir SerbiaOTP banka
STMG ran the programme for our 46,000 m² mixed-use scheme in Belgrade. They held the contractor accountable, kept the cost plan honest and delivered the building one month ahead of schedule.
CEO
Investor — Belgrade
NAME ON APPROVAL

Common questions, candid answers.

Ideally at feasibility — the earliest decisions (site, brief, budget) carry the largest cost and time impact. We can however join at any stage; a structured handover protocol covers late engagement.

Three options depending on scope: (1) percentage of construction cost, (2) fixed lump sum, (3) man-hour rates with a capped budget. Most engagements use option 1 or 2; option 3 suits feasibility and advisory phases.

Either model. We act as Owner's Representative when the client has no internal capacity, or we embed a PM lead within the client team for knowledge transfer. Both modes are common across our portfolio.

Primavera P6 / MS Project for programme, Procore or Aconex for document control, Power BI dashboards for client reporting, and FIDIC red / yellow / silver for contracts. The stack adapts to client preferences.

Discuss a PM engagement.

Tell us about the project — sector, location, GFA, target programme. We'll come back within two working days.